Slope Engineering

  • Slope Rehabilitation (FS)
  • Embankment Rehabilitation (FE)
  • Reinforced Soil Slope (RSS)
  • Hybrid Slope (HS)
  • Soil Nail (SN)

 

Rehabilitation of Failed Slope (FS) and Failed Embankment (FE)
A critical task which requires competent engineering input in the design and construction of failed slope/embankment.

 

Reinforced Soil Slope (RSS)
Construction of slope up to 45° with geosynthetic reinforcement for maximizing land use.

 

Soil Nail (SN)
An economical technique to reinforce and strengthen the existing ground/slope by installing closely spaced steel bar called soil nail.

 

Hybrid Slope (HS)
The combination of Reinforced Soil Slope (RSS) and Soil Nail (SN) ensuring slope stability during construction as well as enchancing the long term slope stability.

 

 
   

 

Copyright © 2008 Soil & Slope Sdn. Bhd. All rights reserved.